70,500 tDS2025-26sourcedhigh confidence
Tonnes of dry solids, year to 31 March 2026. The year before it was 76,300 tDS (2024-25 Table 8A.3).
Welsh Water, Annual Performance Report 2025-26 (tables)Table 8A, line 8A.3 (70.5 ttds)
35,000 tDS2025-26sourcedhigh confidence
About half of the 70,500 tDS produced. The difference is what treatment, mainly digestion, breaks down; we read it as mostly converted to biogas and water. Nearly all of what is left (99.8%) is recycled to farmland. Digestion is not total destruction.
Welsh Water, Annual Performance Report 2025-26 (tables)Table 8A, line 8A.8, 'Total sewage sludge disposed' (35.0 ttds)
98.2%2025-26sourcedhigh confidence
The company's reported result for the year, not a target. A company-wide share of all sludge, by weight; the target in its price review was 97.3% (the 2024-25 result was 98.3% on that measure, and it says 'a small volume' was not processed through the four plants because of maintenance). A further 0.2% went through advanced digestion run by a third party. Most sludge is made elsewhere and carried to the four plants; our check of its routing data is below.
Welsh Water, Annual Performance Report 2025-26 (tables)Table 8D, line 8D.4, 'by incumbent'
37.3%2024-25sourcedmedium confidence
This is why 98% of the company's sludge can be digested although it has hundreds of works: the 98% is company-wide, not per site. Our sum from the company's published return, not a figure the company states.
Welsh Water, Bioresources market information 2024-25sheets WwTW, Small WwTW and STC: sludge made at the works co-located with Afan, Cardiff Bay, Cog Moors and Five Fords, as a share of all sludge listed
2,432.165 + 13,966.739 + 7,151.686 + 4,613.634 = 28,164.224 tDS, of 73,932.593 tDS from the 137 larger works plus 1,493.447 tDS from the 450 small works (75,426.039 tDS). The rest, about 63%, is made at other works and carried to a digester, or to a thickening or dewatering centre first, by tanker or pipeline.
90.9%2024-25sourcedmedium confidence
An independent check on the reported 98%, and a floor, not an estimate of the whole. It shows the 98% is an outcome of where the tonnes actually go, not a target. Our arithmetic from the company's published return.
Welsh Water, Bioresources market information 2024-25sheets WwTW, Small WwTW and STC: where each works sends its sludge, and where each treatment centre sends it on
Each of the 137 larger works names where its sludge goes (and what share). Each of the 23 thickening and dewatering centres, and the two conventional digesters, names where they send it on, and almost all of it goes to Afan, Cardiff Bay, Cog Moors or Five Fords. Following the tonnes through those links puts 68,591 of 75,426 tDS at an advanced plant. The other 9% cannot be traced in the return: the 450 small works give no route (1,493 tDS), some routes do not add up to 100%, and a few destinations are not listed.
0.6%2025-26sourcedhigh confidence
Welsh Water, Annual Performance Report 2025-26 (tables)Table 8D, line 8D.3
1.0%2025-26sourcedhigh confidence
Welsh Water, Annual Performance Report 2025-26 (tables)Table 8D, line 8D.2
99.8%2025-26sourcedhigh confidence
Welsh Water, Annual Performance Report 2025-26 (tables)Table 8D, line 8D.11
86,407 tDS2024-25sourcedmedium confidence
Welsh Water, Bioresources market information 2024-25sheet STC, 'Total capacity (annual)', 2024_25
Afan 17,947 + Cardiff Bay 29,009 + Cog Moors 20,075 + Five Fords 19,376 tonnes dry solids input per year, as stated by the company.
7,053 tDS2024-25sourcedmedium confidence
The company's own stated headroom for the year. What it could be used for (for example farm or food waste) is a question, not a fact.
Welsh Water, Bioresources market information 2024-25sheet STC, row 'Floating capacity - Afan, Cardiff Bay, Cogmoor Digesters & Five Fords AAD sites', 'Headroom capacity (annual)'
3.1%2024-25sourcedmedium confidence
Welsh Water already pumps and tankers sludge this watery between its works. Our sum from the company's published return.
Welsh Water, Bioresources market information 2024-25sheet WwTW: quantity of raw sludge and its average dry solids, for the 137 larger works
73,933 tDS of sludge, at each works' own dry-solids percentage, is 2,353,826 tonnes of wet sludge as produced: 73,933 ÷ 2,353,826 = 3.1%. Median works 3.7%; range 0.4% to 7.2%.
35.2 GWh2025-26sourcedhigh confidence
Welsh Water, Annual Performance Report 2025-26 (tables)Table 8C, lines 8C.2-8C.4, electricity column
15,003 + 15,220 + 4,970 MWh (used in bioresources, used elsewhere in the company, exported).
40.3 GWh2025-26sourcedhigh confidence
Welsh Water, Annual Performance Report 2025-26 (tables)Table 8C, line 8C.4, biomethane column
40,272 MWh.
66.3 GWh2025-26sourcedhigh confidence
Welsh Water, Annual Performance Report 2025-26 (tables)Table 8C, lines 8C.2 and 8C.5, heat column
38,817 MWh used in bioresources + 27,498 MWh unused.
27.5 GWh2025-26sourcedhigh confidence
2024-25 was 41.0 GWh unused.
Welsh Water, Annual Performance Report 2025-26 (tables)Table 8C, line 8C.5 ('generated by bioresources that is unused')
27,498 MWh.
141.8 GWh2025-26sourcedhigh confidence
Three different forms of energy added together; useful as a scale, not as a like-for-like efficiency.
Welsh Water, Annual Performance Report 2025-26 (tables)Table 8C, lines 8C.2-8C.5, total column
Electricity 35,193 + biomethane 40,272 + heat 66,315 MWh.
0.031 kWh2025-26sourcedmedium confidence
Welsh Water, Annual Performance Report 2025-26 (tables)Table 8C (35.2 GWh) and Table 3C (resident population 3,146.5 thousand)
35,193 MWh ÷ 3,146,501 residents ÷ 365 days = 0.0306 kWh. The retired figure of 0.5 kWh was about 16 times this.
23%2024-25sourcedhigh confidence
From wind, hydro, solar and advanced digestion together; sludge is only part of it.
Welsh Water, Annual Performance Report 2024-25 (overview)section 3, Ft3 'Energy self-sufficiency'; text on p.11
35%2024-25sourcedhigh confidence
Welsh Water says it missed the target partly because some planned renewable schemes were not delivered 'as a result of planning approval and third-party land issues'.
Welsh Water, Annual Performance Report 2024-25 (overview)section 3, Ft3 'Energy self-sufficiency', target
£6.6m2025-26sourcedhigh confidence
Welsh Water, Annual Performance Report 2025-26 (tables)Table 8C, lines 8C.7, 8C.8, 8C.12
Renewables Obligation Certificates £2.072m + Renewable Heat Incentive £4.501m = £6.573m.
£1.6m2025-26sourcedhigh confidence
Welsh Water, Annual Performance Report 2025-26 (tables)Table 8C, line 8C.4, £m total (1.553)
£93.8m2024-25sourcedhigh confidence
Gross, before income. It replaces a 2021 trade-press figure that the first version of this site used.
Welsh Water, Annual Performance Report 2024-25 (tables)Table 2B, line 2B.1 'Power', total (93.840)
£1.1bn2025-30sourcedhigh confidence
Ofwat, Overview of Dŵr Cymru's PR24 final determination'Dŵr Cymru is expected to deliver a 30% improvement to storm overflows supported by an expenditure allowance of £1.1 billion'
30 spills2029-30sourcedhigh confidence
Ofwat, Overview of Dŵr Cymru's PR24 final determination'average spills target at 30 spills per overflow, representing a 30% reduction'
60%2030sourcedhigh confidence
Ofwat, PR24 final determinations: delivering outcomes for customers and the environmentWales PR24 Forum strategic steer: 100% by 2040, interim expectation of 60% by 2030
100%2040sourcedhigh confidence
Ofwat, PR24 final determinations: delivering outcomes for customers and the environmentWales PR24 Forum strategic steer
165 schemes2025-30sourcedhigh confidence
846,568 m³ of additional or equivalent storage. Welsh Water rates its own delivery 'Amber': slower progress than the final-determination profile.
Welsh Water, Price control deliverables delivery plan commentary, August 2025section 4.3 Storm Overflows (PCDWW5)
846,568 m³2025-30sourcedhigh confidence
Welsh Water, Price control deliverables delivery plan commentary, August 2025section 4.3 Storm Overflows (PCDWW5)
£44.72m5 June 2026sourcedhigh confidence
Ofwat: 'entirely funded by the company, rather than customers'.
Ofwat, enforcement case into Dŵr Cymru's sewage treatment works and sewerage networkfinal decision, 5 June 2026
Ofwat gives the total as £44.72m. Its four parts (£40.66m, £2.0m, £1.0m, £1.066m) are rounded and add to £44.726m.
£40.66m2025-30sourcedhigh confidence
Ofwat, enforcement case into Dŵr Cymru's sewage treatment works and sewerage networkredress package, first item
£2.0m2025-30sourcedhigh confidence
Ofwat, enforcement case into Dŵr Cymru's sewage treatment works and sewerage networkredress package, second item
£1.0m2025-30sourcedhigh confidence
Ofwat, enforcement case into Dŵr Cymru's sewage treatment works and sewerage networkredress package, third item
£40.6m5 June 2026sourcedhigh confidence
Ofwat, enforcement case into Dŵr Cymru's sewage treatment works and sewerage network'£40.6 million, 7.5% of the company's relevant turnover'
£39.4m28 May 2024sourcedhigh confidence
Often reported as a '£40m fine'. It was not a fine.
Ofwat, enforcement case on Welsh Water's leakage and per capita consumption reporting'nominal penalty of £1' and 'a redress package valued at £39.4m'
78 of 1122025 seasonsourcedhigh confidence
110 of 112 met the standard. The map on this site still shows the 2024 classifications.
Natural Resources Wales, Wales Bathing Water Report 2025Executive summary: 78 Excellent, 26 Good, 6 Sufficient, 2 Poor
75 of 1102024 seasonsourcedhigh confidence
2023 was 80 of 109.
Natural Resources Wales, Wales Bathing Water Report 2024Executive summary: 75 Excellent, 28 Good, 5 Sufficient, 2 Poor
100%2024-25sourcedmedium confidence
Northumbrian Water's own report. The claim to be 'the only' such company is also its own and we have not checked it.
Northumbrian Water, Annual Performance Report 2024-25
32%2019 (PR19 models)sourcedlow confidence
Northumbrian's own analysis of Ofwat's 2019 bioresources models, not an Ofwat statement.
Northumbrian Water, PR24 business plan annex NES64 (bioresources strategy)
3,000 jobs2025-30sourcedlow confidence
A company projection for the whole investment programme (pipes, sewers, treatment), not for digestion. The basis is not stated.
Northumbrian Water Group, news release 30 January 2025
£5352026-27sourcedhigh confidence
Lowest of the combined companies. Regional costs differ, so this does not show an effect of digestion.
Water UK, annual average bill changes 2026-27table: Northumbrian Water £535
£6832026-27sourcedhigh confidence
National average £639.
Water UK, annual average bill changes 2026-27table: Dŵr Cymru (Welsh Water) £683
287,576 properties2024sourcedhigh confidence
DESNZ counts properties without a gas meter, so this includes second homes and empty properties.
DESNZ, Subnational estimates of properties not connected to the gas network, 2015-2024workbook sheet '2024', row 'Wales', 287.576 thousand
19.46%2024sourcedhigh confidence
Fifth of eleven nations and regions of Great Britain. The South West is highest at 24.24%.
DESNZ, Subnational estimates of properties not connected to the gas network, 2015-2024workbook sheet '2024', row 'Wales', 0.1946
74.61%2024sourcedhigh confidence
The highest share of any mainland local authority in Great Britain; only four island authorities are higher.
DESNZ, Subnational estimates of properties not connected to the gas network, 2015-2024workbook sheet '2024', row 'Ceredigion'
50 sites2023sourcedhigh confidence
18 MW of electrical capacity and 94 GWh a year of electricity, across sewage, farm and food-waste plants together.
Welsh Government, Energy generation in Wales 2023table of generation by technology; text: 'Wales has 50 anaerobic digestion sites totalling 26.9 MW'
254,100 cowsJune 2025sourcedhigh confidence
1,079,500 cattle and calves in all.
Welsh Government, Survey of agriculture and horticulture: June 2025'dairy females aged 2+ years that had calved… 254,100'
£200,000–£500,000October 2024sourcedmedium confidence
Farmers Weekly, quoting a farm consultancy. Its 44 kW example cost £300,000.
Farmers Weekly, how farm-scale AD can offer sustainability and savings (23 October 2024)'typically varying from 22 to 74kW and costing anything from £200,000 to £500,000'
1%October 2024sourcedmedium confidence
Farmers Weekly's worked example, not a measurement. The same article reports a 22 kW plant paying back in about ten years where the power replaces electricity bought at 30p.
Farmers Weekly, how farm-scale AD can offer sustainability and savings (23 October 2024)worked example: net income £2,284, 1% return on investment at 32p/kWh
9%2011 data in a 2017 reportsourcedmedium confidence
About three times as dry as the raw sludge above, so carrying slurry is no more watery than carrying sewage sludge.
Ricardo Energy & Environment for ClimateXChange, Farmyard manure, slurry and anaerobic digestion in Scotland (2017)Table 1: dairy cattle slurry, dry matter 9%
22 m³2011 data in a 2017 reportsourcedmedium confidence
'A fifth of that for household food waste and grass silage': slurry alone makes little gas, which is why co-digestion with richer feedstocks usually carries the economics.
Ricardo Energy & Environment for ClimateXChange, Farmyard manure, slurry and anaerobic digestion in Scotland (2017)Table 1: dairy cattle slurry, biogas 22 m³ per tonne fresh weight
23 tonnesOctober 2025sourcedmedium confidence
Farmers Weekly. Other estimates are lower for cows housed only part of the year.
Farmers Weekly, on-farm slurry-fed anaerobic digestion: what to consider (28 October 2025)'A dairy cow produces about 23t of slurry a year'
£70,0002024-26sourcedmedium confidence
The farm and the heat-pump supplier, Arkaya Energy, as reported by a journalist. We have not seen the data. One farm in south-west England, not Wales.
The heat pumps cool the milk and use the heat taken out of it to heat washing water to 92°C. The farm says they halve its electricity use.
The Guardian (from Canary Media), 'It bloody works': why the world's oldest cheddar-maker uses a 'milk-source' heat pump, 17 September 2026'saving Barber's about £70,000 a year'
2 years2024-26sourcedmedium confidence
The farm, as reported. 'Less than two years': an upper bound, not a measurement.
The Guardian (from Canary Media), 'It bloody works': why the world's oldest cheddar-maker uses a 'milk-source' heat pump, 17 September 2026'the payback on its heat pumps is less than two years'